✨ Unlock Data Exports And Disclosure Access.Start Your 30-Day Free Trial Today →

Borr Drilling Ltd

Common Name
Borr Drilling
Country
Bermuda
Sector
N/A
Industry
N/A
Employees
N/A
Ticker
N/A

Borr Drilling's Waste Data Preview

In 2024, Borr Drilling conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.

Metric (tonnes)2024
Total Waste Generated
13,207.9a
Total Waste Recovered
2,977.9a
Total Hazardous Waste Generated
9,163a
Non-Hazardous Waste Disposed
N/A
Usage Policy

You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: Tracenable, the global reference for ESG data"

Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.

Access Datasets, Disclosures, and Sources
pro
Remove manual data sourcing from your workflow. Subscribe to Tracenable Pro to get credits for accessing and exporting datasets and disclosures across 8,500+ companies with 10+ years of historical coverage.
Download granular datasets (CSV/XLS)
Access underlying corporate disclosures (PDF)
Trace all values back to their original sources
Formats Included
Excel
CSV
Json
All data fully traceable to original sources
Used by 1,000+ teams in finance, climate, and research

Verified Sources Behind Borr Drilling’s Waste Management Data

Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.

a. Borr Drilling's Sustainability Report 2024

Insights into Borr Drilling’s Generation of Hazardous and Non-Hazardous Waste

In 2024, Borr Drilling generated a total of 13,208 metric tonnes of waste.a

Of this amount, 69.38% of Borr Drilling's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.30.62% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.a

How does Borr Drilling treat its hazardous waste?

In 2024, Borr Drilling reported that 9,163 metric tonnes of its total waste output were classified as hazardous. This represents 69.38% of its overall waste generation.a

The company treated this hazardous waste using a combination of methods.Only 0.85% of hazardous waste was recovered, meaning the vast majority was treated through disposal methods such as landfilling or incineration. This raises concerns about the environmental and health risks associated with Borr Drilling’s current hazardous waste practices.a

Breakdown of Borr Drilling's Hazardous and Non-Hazardous Waste by Treatment Method

Hazardous WasteDisposed(68.8%)Total Non-HazardousWaste Generated(30.6%)
Want Full Access to Borr Drilling's Waste Management Dataset?
Start 30-Day Free Trial