Bumrungrad Hospital PCL

Common Name
Bumrungrad Hospital
Country
Thailand
Sector
Healthcare
Industry
Medical Care Facilities
Employees
N/A
Ticker
BH
Exchange
STOCK EXCHANGE OF THAILAND
Description
Bumrungrad Hospital Public Company Limited is a prominent healthcare service provider located in Bangkok, Thailand. It operates one of the largest private hospitals in Southeast Asia, delivering world...

Bumrungrad Hospital's GHG Emissions Data Preview

In 2024, Bumrungrad Hospital completed a corporate carbon footprint assessment and publicly disclosed its greenhouse gas (GHG) emissions according to the GHG Protocol, covering Scope 1 (direct emissions from owned or controlled sources), Scope 2 (indirect emissions from purchased energy) and Scope 3 (indirect emissions across the value chain).

However, Bumrungrad Hospital has not published a category-level breakdown of its Scope 3 emissions, limiting visibility into specific value chain sources.

Metric (tCO2e)2024202320222021 - 2017
Total Scope 1
Copy restricted. Please purchase to unlock this data.
a
Copy restricted. Please purchase to unlock this data.
b
Copy restricted. Please purchase to unlock this data.
0000000
Total Scope 2
Unspecified Calculation Method
Copy restricted. Please purchase to unlock this data.
a
Copy restricted. Please purchase to unlock this data.
b
Copy restricted. Please purchase to unlock this data.
0000000
Total Scope 3
Copy restricted. Please purchase to unlock this data.
a
Copy restricted. Please purchase to unlock this data.
b
Copy restricted. Please purchase to unlock this data.
0000000
Total Scope 1 Revenue Intensity (tCO2e/$M)
Copy restricted. Please purchase to unlock this data.
a
Copy restricted. Please purchase to unlock this data.
b
Copy restricted. Please purchase to unlock this data.
0000000
Download Data

Verified Sources Behind Bumrungrad Hospital’s Greenhouse Gas (GHG) Emissions Data

Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform. Explore Bumrungrad Hospital’s data sources below and access millions more through our Disclosure Search.

a. Bumrungrad Hospital's Annual Report 2024
a. Bumrungrad Hospital's Annual Report 2024
b. Bumrungrad Hospital's Sustainability Report 2023
b. Bumrungrad Hospital's Sustainability Report 2023

Insights into Bumrungrad Hospital's Operational Emissions

In 2024, the total operational greenhouse gas (GHG) emissions of Bumrungrad Hospital amounted to 29,557.38 metric tons of CO2 equivalent. This figure includes both direct emissions from owned or controlled sources (Scope 1) and indirect emissions from purchased energy (Scope 2). a

Compared to 2023, the total operational greenhouse gas (GHG) emissions of Bumrungrad Hospital decreased by 0.17%, showing that the company has made progress in taking action to reduce the climate impact of its operations. a b

Bumrungrad Hospital's Scope 1 Emissions Over Time

2023202409501.9 k2.85 k3.8 ktCO2e+4%
  • Total Scope 1
  • Year-over-Year Change

What are Bumrungrad Hospital's Scope 1 emissions?

In 2024, the total Scope 1 emissions of Bumrungrad Hospital were 3,737.14 metric tons of CO₂ equivalent (tCO₂e). a

Compared to the previous year (2023), Bumrungrad Hospital's Scope 1 emissions increased by 4.01%, suggesting that the company faced challenges in reducing emissions from its directly owned or controlled operations. a b

What are Bumrungrad Hospital's Scope 2 emissions?

In 2024, Bumrungrad Hospital reported Scope 2 greenhouse gas (GHG) emissions of 25,820.24 tCO₂e without specifying the calculation method. a

Has Bumrungrad Hospital reduced its Scope 2 emissions over time?

Compared to the previous year (2023), Bumrungrad Hospital's Scope 2 emissions (Unspecified Calculation Method) have remained relatively stable, indicating that Bumrungrad Hospital 's emissions have plateaued with no significant change in its energy consumption footprint. a b

What methodology does Bumrungrad Hospital use for Scope 2 reporting?

In 2024, Bumrungrad Hospital reported its Scope 2 emissions using an unspecified methodology. a

Bumrungrad Hospital's Scope 2 Emissions Over Time

2023202407 k14 k21 k28 ktCO2e
  • Total Scope 2 (Unspecified Calculation Method)

Insights into Bumrungrad Hospital's Value Chain Emissions

In 2024, Bumrungrad Hospital reported 4,416.62 metric tons of CO₂ equivalent (tCO₂e) of Scope 3 greenhouse gas (GHG) emissions, representing indirect emissions across its upstream and downstream value chain. a

The 2024 disclosure of Bumrungrad Hospital includes a breakdown across 0 of the 15 Scope 3 categories defined by the GHG Protocol, matching the level of disclosure in 2023, demonstrating consistent Scope 3 emissions reporting coverage year over year. a

Bumrungrad Hospital's Scope 3 Emissions Over Time

2023202401.5 k3 k4.5 k6 ktCO2e+8%
  • Total Scope 3
  • Year-over-Year Change

What are Bumrungrad Hospital's Scope 3 emissions?

In 2024, Bumrungrad Hospital reported total Scope 3 emissions of 4,416.62 metric tons of CO₂ equivalent (tCO₂e). a

Compared to the previous year (2023), Bumrungrad Hospital's Scope 3 emissions remained relatively stable, indicating that Bumrungrad Hospital 's emissions have plateaued with no significant change in its value chain footprint. a b

Insights into Bumrungrad Hospital’s GHG Emissions Intensity Compared to Industry Peers

In 2024, Bumrungrad Hospital reported Scope 1 greenhouse gas (GHG) emissions of 3,737.14 tCO₂e and total revenues of USD 749 millions. This translates into an emissions intensity of 4.99 tCO₂e per millions USD. a

Bumrungrad Hospital's Scope 1 Emissions Intensity Compared to Peers

202002,00020,000200,000Scope 1 Emissions (tCO2e)505002,00010,00050,000Revenues (Millions of USD)HCCEJinxin Fertility GroupYear: 2023Scope 1: 1,275 tCO2eRevenue: $M 429Scope 1 Intensity: 2.97 tCO2e/$MLippo KarawaciYear: 2024Scope 1: 11,330 tCO2eRevenue: $M 705Scope 1 Intensity: 16.06 tCO2e/$MMedicoverYear: 2024Scope 1: 6,020 tCO2eRevenue: $M 24,216Scope 1 Intensity: 0.25 tCO2e/$MThonburi Healthcare GroupYear: 2023Scope 1: 251 tCO2eRevenue: $M 286Scope 1 Intensity: 0.88 tCO2e/$MRyman HealthcareYear: 2024Scope 1: 4,318 tCO2eRevenue: $M 389Scope 1 Intensity: 11.10 tCO2e/$MAster DM HealthcareYear: 2024Scope 1: 9,459 tCO2eRevenue: $M 437Scope 1 Intensity: 21.66 tCO2e/$MGlobal HealthYear: 2025Scope 1: 5,353 tCO2eRevenue: $M 432Scope 1 Intensity: 12.39 tCO2e/$MKIMS HospitalsYear: 2025Scope 1: 1,057 tCO2eRevenue: $M 355Scope 1 Intensity: 2.98 tCO2e/$MHHHygeia Healthcare HoldingsYear: 2023Scope 1: 2,681 tCO2eRevenue: $M 627Scope 1 Intensity: 4.27 tCO2e/$MBangkok Chain HospitalYear: 2024Scope 1: 2,756 tCO2eRevenue: $M 343Scope 1 Intensity: 8.02 tCO2e/$MChularat HospitalYear: 2023Scope 1: 2,075 tCO2eRevenue: $M 225Scope 1 Intensity: 9.24 tCO2e/$MRhoen KlinikumYear: 2024Scope 1: 27,423 tCO2eRevenue: $M 1,660Scope 1 Intensity: 16.52 tCO2e/$MMLP Saglik HizmetleriYear: 2023Scope 1: 17,586 tCO2eRevenue: $M 760Scope 1 Intensity: 23.15 tCO2e/$MVibhavadi Medical CenterYear: 2023Scope 1: 4,083 tCO2eRevenue: $M 237Scope 1 Intensity: 17.20 tCO2e/$MBDMSYear: 2024Scope 1: 31,975 tCO2eRevenue: $M 3,142Scope 1 Intensity: 10.18 tCO2e/$MPihlajalinnaYear: 2024Scope 1: 446 tCO2eRevenue: $M 733Scope 1 Intensity: 0.61 tCO2e/$MRede D'Or Sao LuizYear: 2024Scope 1: 76,147 tCO2eRevenue: $M 8,186Scope 1 Intensity: 9.30 tCO2e/$MCCChina Evergrande New Energy Vehicle GroupYear: 2023Scope 1: 1,029 tCO2eRevenue: $M 206Scope 1 Intensity: 4.99 tCO2e/$MFortis HealthcareYear: 2025Scope 1: 4,600 tCO2eRevenue: $M 904Scope 1 Intensity: 5.09 tCO2e/$MCCC-Mer Medical HoldingsYear: 2023Scope 1: 60 tCO2eRevenue: $M 246Scope 1 Intensity: 0.25 tCO2e/$MApollo Hospitals EnterpriseYear: 2023Scope 1: 8,033 tCO2eRevenue: $M 2,003Scope 1 Intensity: 4.01 tCO2e/$MEEEmeisYear: 2024Scope 1: 98,870 tCO2eRevenue: $M 5,865Scope 1 Intensity: 16.86 tCO2e/$MDaVitaYear: 2024Scope 1: 54,485 tCO2eRevenue: $M 12,815Scope 1 Intensity: 4.25 tCO2e/$MBumrungrad HospitalYear: 2024Scope 1: 3,737 tCO2eRevenue: $M 749Scope 1 Intensity: 4.99 tCO2e/$M

How does Bumrungrad Hospital's GHG emissions intensity compare to its peers?

In 2024, Bumrungrad Hospital reported a Scope 1 emissions intensity of 4.99 tCO₂e per millions USD. Compared to the peer group median of 8.02 , this places the company below its industry benchmark, indicating it is more carbon-efficient than most competitors. a

Where does Bumrungrad Hospital rank on GHG emissions intensity within its industry?

In 2024, Bumrungrad Hospital ranked 10 out of 23 companies in its industry peer group, based on Scope 1 emissions intensity (measured in tCO₂e per millions USD). a

Bumrungrad Hospital is therefore positioned in the mid-range of its industry, neither a clear leader nor a laggard in carbon efficiency. a

Insights into Bumrungrad Hospital's Total Carbon Footprint

In 2024, Bumrungrad Hospital reported a total carbon footprint of 33,974 metric tons of CO₂ equivalent (tCO₂e) across Scope 1, Scope 2, and Scope 3 emissions. This represents a 0.85% increase compared to 2023, suggesting a rise in emissions across its operations or value chain. a b

The largest contributor to Bumrungrad Hospital's total carbon footprint was Scope 2 emissions, accounting for 76% of the company's total carbon footprint, followed by Scope 3 emissions at 13%. a

Want Full Access to Bumrungrad Hospital's GHG Emissions Dataset?
Sign Up