In 2023, Dalrymple Bay Infrastructure conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.
| Metric (tonnes) | 2023 | 2022 | 2021 | 2020-2019 |
|---|---|---|---|---|
Total Waste Generated | 3,368a | 2,851a | 2,756a | |
Total Waste Recovered | 2,456a | 1,947a | 1,748a | |
Total Hazardous Waste Generated | 2,115a | 1,397a | 1,350a | |
Non-Hazardous Waste Disposed | 519a | 523a | 550a |
You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: ESG Data from Tracenable"
Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.
Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.
In 2023, Dalrymple Bay Infrastructure generated a total of 3,368metric tonnes of waste.a
Of this amount, 72.92% of Dalrymple Bay Infrastructure's total waste generated was recovered through methods such as recycling, reuse, or composting, while 27.08% was disposed of through landfilling, incineration, or combustion.a
In 2023, Dalrymple Bay Infrastructure reported a total waste generation of 3,368 metric tonnes, of which 72.92% was recovered through recycling, reuse, or composting.This moderate level of recovery indicates that Dalrymple Bay Infrastructure is taking steps toward improving its waste diversion practices, though there is still room to enhance recycling and recovery efforts.a
Since 2021, Dalrymple Bay Infrastructure's total waste generation increased by 22.21%, including a 18.13%increase in 2023, indicating a persistent upward trend that may reflect scaling operations, inefficiencies in resource use, or a lack of effective waste minimization practices.a
Over the same period, Dalrymple Bay Infrastructure's waste recovery rate increased by 14.97%, including a 6.78% rise in 2023, indicating growing emphasis on circularity and improved operational practices for diverting waste from disposal.a
Overall, Dalrymple Bay Infrastructure has seen a consistent rise in waste generation both over the long term and in the year 2023. However, the company has also steadily improved its waste recovery performance, suggesting that it is actively working to offset the environmental consequences of increased production through enhanced circularity efforts.
In 2023, Dalrymple Bay Infrastructure generated a total of 3,368 metric tonnes of waste.a
Of this amount, 62.8% of Dalrymple Bay Infrastructure's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.37.2% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.a
Since 2021, Dalrymple Bay Infrastructure's total waste generation increased by 22.21%, including a 18.13% rise in 2023, reflecting a persistent upward trend that could be linked to operational growth, inefficient material use, or limited investment in waste prevention systems.a
Over the same period, the share of hazardous waste in Dalrymple Bay Infrastructure's total output increased by 28.2%, including a further 28.16% rise in 2023, suggesting a troubling upward shift toward more environmentally harmful waste streams that could raise compliance costs and environmental risks.a
Overall, Dalrymple Bay Infrastructure has seen a continuous rise in both total waste and hazardous waste over time, signaling a worsening environmental impact that may require urgent reassessment of material sourcing, production processes, or waste mitigation strategies.a
In 2023, Dalrymple Bay Infrastructure reported that 2,115 metric tonnes of its total waste output were classified as hazardous. This represents 62.8% of its overall waste generation.a
The company treated this hazardous waste using a combination of methods.A majority (81.42%) was diverted from disposal through recovery-oriented treatments such as recycling or reuse. This suggests that Dalrymple Bay Infrastructure has established processes to reduce the environmental burden of its most harmful waste streams.a