✨ Unlock Data Exports And Disclosure Access.Start Your 30-Day Free Trial Today →

Equinox Gold Corp

Common Name
Equinox Gold
Country
Canada
Sector
Basic Materials
Industry
Gold
Employees
3,692
Ticker
EQX
Exchange
NYSE MKT LLC
Description
Equinox Gold Corp. is a growth-focused gold mining company headquartered in Vancouver, Canada. It operates a portfolio of mines across the Americas, including key assets in Canada such as Greenstone a...

Equinox Gold's Waste Data Preview

In 2025, Equinox Gold conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.

Metric (tonnes)2025202420232022-2019
Total Waste Generated
203,371,578a
152,537,541a
132,378,628a
Total Waste Recovered
N/AN/AN/A
Total Hazardous Waste Generated
4,481a
1,406a
992a
Non-Hazardous Waste Disposed
28,704.4a
N/AN/A
Usage Policy

You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: Tracenable, the global reference for ESG data"

Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.

Access Datasets, Disclosures, and Sources
pro
Remove manual data sourcing from your workflow. Subscribe to Tracenable Pro to get credits for accessing and exporting datasets and disclosures across 8,500+ companies with 10+ years of historical coverage.
Download granular datasets (CSV/XLS)
Access underlying corporate disclosures (PDF)
Trace all values back to their original sources
Formats Included
Excel
CSV
Json
All data fully traceable to original sources
Used by 1,000+ teams in finance, climate, and research

Verified Sources Behind Equinox Gold’s Waste Management Data

Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.

a. Equinox Gold's Financial & Extra-Financial Data Spreadsheet 2025

Insights into Equinox Gold’s Generation of Hazardous and Non-Hazardous Waste

In 2025, Equinox Gold generated a total of 203,371,578 metric tonnes of waste.a

Of this amount, 0% of Equinox Gold's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.0.02% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.The remaining 99.98% was either treated using unspecified methods or not clearly categorized.a

Equinox Gold’s Hazardous vs Non-Hazardous Waste Over Time

2022202320242025035 k70 k105 k140 ktonnes
  • Total Non-Hazardous Waste Generated
  • Total Hazardous Waste Generated

How Equinox Gold reduced the environmental impact of its waste?

Since 2022, Equinox Gold's total waste generation increased by 30.19%, including a 33.33% rise in 2025, reflecting a persistent upward trend that could be linked to operational growth, inefficient material use, or limited investment in waste prevention systems.a

Over the same period, the share of hazardous waste in Equinox Gold's total output increased by 254.1%, including a further 139.04% rise in 2025, suggesting a troubling upward shift toward more environmentally harmful waste streams that could raise compliance costs and environmental risks.a

Overall, Equinox Gold has seen a continuous rise in both total waste and hazardous waste over time, signaling a worsening environmental impact that may require urgent reassessment of material sourcing, production processes, or waste mitigation strategies.a

How does Equinox Gold treat its hazardous waste?

In 2025, Equinox Gold reported that 4,481 metric tonnes of its total waste output were classified as hazardous. This represents 0% of its overall waste generation.a

The company treated this hazardous waste using a combination of methods.Approximately 15.61% was managed through recovery methods, indicating a moderate integration of circular practices into its hazardous waste management. However, a significant share was still directed toward disposal, highlighting room for improvement in reducing the long-term impact of hazardous materials.a

Breakdown of Equinox Gold's Hazardous and Non-Hazardous Waste by Treatment Method

Hazardous WasteDisposed(10.3%)Non-Hazardous WasteDisposed(77.9%)Non-Hazardous WasteRecovered(10.0%)
Want Full Access to Equinox Gold's Waste Management Dataset?
Start 30-Day Free Trial