📣 Introducing Tracenable Pro: Unlock Unlimited Data Exports & Disclosures Access.
In 2023, Jardine Cycle & Carriage conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.
| Metric (tonnes) | 2023 | 2022 | 2021 | 2020 - 2017 |
|---|---|---|---|---|
Total Waste Generated | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | 0000000 |
Total Waste Recovered | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | 0000000 |
Total Hazardous Waste Generated | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | 0000000 |
Non-Hazardous Waste Disposed | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | Copy restricted. Please purchase to unlock this data. | 0000000 |
Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform. Explore Jardine Cycle & Carriage’s data sources below and access millions more through our Disclosure Search.
In 2023, Jardine Cycle & Carriage generated a total of 2,808,700metric tonnes of waste.a
Of this amount, 98.59% of Jardine Cycle & Carriage's total waste generated was recovered through methods such as recycling, reuse, or composting, while 1.41% was disposed of through landfilling, incineration, or combustion.a
In 2023, Jardine Cycle & Carriage reported a total waste generation of 2,808,700 metric tonnes, of which 98.59% was recovered through recycling, reuse, or composting.This high recovery rate suggests that Jardine Cycle & Carriage has implemented strong circular economy practices and actively prioritizes sustainable waste management.a
Since 2019, Jardine Cycle & Carriage's total waste generation decreased by 15.39%, and remained stable in 2023, which may indicate a new baseline following earlier reductions in waste output.a
Over the same period, Jardine Cycle & Carriage's waste recovery rate remained stable both in the long term and in 2023, suggesting limited progress, or consistent recovery performance, without major shifts in strategy.a
Overall, Jardine Cycle & Carriage’s waste generation and recovery data show a mixed and inconsistent trend. A deeper analysis of the company's activities, industry benchmarks, and operational changes is needed to assess its sustainability performance more precisely.
In 2023, Jardine Cycle & Carriage generated a total of 2,808,700 metric tonnes of waste.a
Of this amount, 1.83% of Jardine Cycle & Carriage's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.98.17% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.a
Since 2019, Jardine Cycle & Carriage's total waste generation decreased by 15.39%, and remained stable in 2023, signaling a plateau following previous reductions that may mark a new waste baseline.a
Over the same period, Jardine Cycle & Carriage saw a long-term increase of 63.42% in hazardous waste share, but a 17.15% reduction in 2023, indicating a recent improvement that may reflect updated production inputs, enhanced treatment, or stricter controls.a
Overall, Jardine Cycle & Carriage's waste and hazardousness trends are mixed or inconclusive. A more detailed review of its materials, industry standards, and operational changes would help clarify the net environmental impact of its waste strategy.a
In 2023, Jardine Cycle & Carriage reported that 51,300 metric tonnes of its total waste output were classified as hazardous. This represents 1.83% of its overall waste generation.a
The company treated this hazardous waste using a combination of methods.A majority (72.71%) was diverted from disposal through recovery-oriented treatments such as recycling or reuse. This suggests that Jardine Cycle & Carriage has established processes to reduce the environmental burden of its most harmful waste streams.a