In 2025, Shanghai Electric Group conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.
| Metric (tonnes) | 2025 | 2024 | 2023 | 2022-2019 |
|---|---|---|---|---|
Total Waste Generated | 90,292.5a | 72,991.18a | 72,240.63a | |
Total Waste Recovered | 77,986.65a | N/A | N/A | |
Total Hazardous Waste Generated | 4,584.4a | 3,761.78a | 3,377.1a | |
Non-Hazardous Waste Disposed | 7,890.29a | 69,229.4a | 68,863.53a |
You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: Tracenable, the global reference for ESG data"
Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.
Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.
In 2025, Shanghai Electric Group generated a total of 90,293metric tonnes of waste.a
Of this amount, 86.37% of Shanghai Electric Group's total waste generated was recovered through methods such as recycling, reuse, or composting, while 13.66% was disposed of through landfilling, incineration, or combustion.a
In 2025, Shanghai Electric Group reported a total waste generation of 90,293 metric tonnes, of which 86.37% was recovered through recycling, reuse, or composting.This high recovery rate suggests that Shanghai Electric Group has implemented strong circular economy practices and actively prioritizes sustainable waste management.a
Since 2023, Shanghai Electric Group's total waste generation increased by 24.99%, including a 23.7%increase in 2025, indicating a persistent upward trend that may reflect scaling operations, inefficiencies in resource use, or a lack of effective waste minimization practices.a
In 2025, Shanghai Electric Group generated a total of 90,293 metric tonnes of waste.a
Of this amount, 5.08% of Shanghai Electric Group's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.94.92% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.a
Since 2023, Shanghai Electric Group's total waste generation increased by 24.99%, including a 23.7% rise in 2025, reflecting a persistent upward trend that could be linked to operational growth, inefficient material use, or limited investment in waste prevention systems.a
Over the same period, Shanghai Electric Group saw a long-term increase of 8.61% in hazardous waste share, but a 1.48% reduction in 2025, indicating a recent improvement that may reflect updated production inputs, enhanced treatment, or stricter controls.a
Overall, Shanghai Electric Group's waste and hazardousness trends are mixed or inconclusive. A more detailed review of its materials, industry standards, and operational changes would help clarify the net environmental impact of its waste strategy.a
In 2025, Shanghai Electric Group reported that 4,584 metric tonnes of its total waste output were classified as hazardous. This represents 5.08% of its overall waste generation.a
The company treated this hazardous waste using a combination of methods.Only 3.61% of hazardous waste was recovered, meaning the vast majority was treated through disposal methods such as landfilling or incineration. This raises concerns about the environmental and health risks associated with Shanghai Electric Group’s current hazardous waste practices.a