In 2025, Swiss Prime Site conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.
| Metric (tonnes) | 2025 | 2024 | 2023 | 2022-2019 |
|---|---|---|---|---|
Total Waste Generated | 11,285a | 7,916a | 12,256a | |
Total Waste Recovered | 4,929a | 3,102a | N/A | |
Total Hazardous Waste Generated | 228a | 30a | N/A | |
Non-Hazardous Waste Disposed | N/A | N/A | N/A |
You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: Tracenable, the global reference for ESG data"
Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.
Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.
In 2025, Swiss Prime Site generated a total of 11,285metric tonnes of waste.a
Of this amount, 43.68% of Swiss Prime Site's total waste generated was recovered through methods such as recycling, reuse, or composting, while 56.32% was disposed of through landfilling, incineration, or combustion.a
In 2025, Swiss Prime Site reported a total waste generation of 11,285 metric tonnes, of which 43.68% was recovered through recycling, reuse, or composting.This moderate level of recovery indicates that Swiss Prime Site is taking steps toward improving its waste diversion practices, though there is still room to enhance recycling and recovery efforts.a
Since 2023, Swiss Prime Site's total waste generation decreased by 7.92%, yet rose by 42.56% in 2025, potentially indicating a temporary operational shift or inconsistency in waste management outcomes.a
Over the same period, Swiss Prime Site's waste recovery rate increased by 11.46%.a
In 2025, Swiss Prime Site generated a total of 11,285 metric tonnes of waste.a
Of this amount, 2.02% of Swiss Prime Site's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.97.98% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.a
Since 2023, Swiss Prime Site's total waste generation fell by 7.92%, but rose by 42.56% in 2025, potentially reflecting a temporary surge in activity or inconsistency in waste control strategies.a
Since 2025, Swiss Prime Site's hazardous waste generation has increased by 433.11%, indicating a potential rise in the use of harmful materials, process inefficiencies, or limited hazardous waste reduction strategies..a
Overall, Swiss Prime Site has seen a recent increase in both total waste and hazardous waste, which may indicate growing operational pressures or insufficient controls on harmful materials.a