In 2025, Yankey Engineering completed a corporate carbon footprint assessment and publicly disclosed its greenhouse gas (GHG) emissions according to the GHG Protocol, covering Scope 1 (direct emissions from owned or controlled sources), Scope 2 (indirect emissions from purchased energy) and Scope 3 (indirect emissions across the value chain).
However, Yankey Engineering has not published a category-level breakdown of its Scope 3 emissions, limiting visibility into specific value chain sources.
| Metric (tCO2e) | 2025 | 2024 |
|---|---|---|
Total Scope 1 | 145.522a | 83.19a |
Total Scope 2 | ||
Unspecified Calculation Method | 363.309a | 225.34a |
Total Scope 3 | 315.599a | 854.89a |
You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: ESG Data from Tracenable"
Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.
Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.
In 2025, the total operational greenhouse gas (GHG) emissions of Yankey Engineering amounted to 508.831 metric tons of CO2 equivalent. This figure includes both direct emissions from owned or controlled sources (Scope 1) and indirect emissions from purchased energy (Scope 2).a
Compared to 2024, the total operational greenhouse gas (GHG) emissions of Yankey Engineering increased by 64.92%, suggesting that the company faced challenges in reducing its emissions from its core operations.a
In 2025, the total Scope 1 emissions of Yankey Engineering were 145.522 metric tons of CO₂ equivalent (tCO₂e).a
Compared to the previous year (2024), Yankey Engineering's Scope 1 emissions increased by 74.93%, suggesting that the company faced challenges in reducing emissions from its directly owned or controlled operations.a
In 2025, Yankey Engineering reported Scope 2 greenhouse gas (GHG) emissions of 363.309 tCO₂e without specifying the calculation method.a
Compared to the previous year (2024), Yankey Engineering's Scope 2 emissions (Unspecified Calculation Method) rose by 61.23% in 2025, suggesting that the company faced challenges in reducing emissions from purchased electricity and energya
In 2025, Yankey Engineering reported its Scope 2 emissions using an unspecified methodology.a
In 2025, Yankey Engineering reported 315.599 metric tons of CO₂ equivalent (tCO₂e) of Scope 3 greenhouse gas (GHG) emissions, representing indirect emissions across its upstream and downstream value chain.a
The 2025 disclosure of Yankey Engineering includes a breakdown across 0 of the 15 Scope 3 categories defined by the GHG Protocol, matching the level of disclosure in 2024, demonstrating consistent Scope 3 emissions reporting coverage year over year.a
In 2025, Yankey Engineering reported total Scope 3 emissions of 315.599 metric tons of CO₂ equivalent (tCO₂e).a
Compared to the previous year (2024), Yankey Engineering's Scope 3 emissions decreased by 63.08%, highlighting the company's efforts to lower indirect emissions from its value chain.a
In 2025, Yankey Engineering reported a total carbon footprint of 824.43 metric tons of CO₂ equivalent (tCO₂e) across Scope 1, Scope 2, and Scope 3 emissions. This represents a 29.14% decrease compared to 2024, indicating progress in reducing its overall greenhouse gas output.a
The largest contributor to Yankey Engineering's total carbon footprint was Scope 2 emissions, accounting for 44.07% of the company's total carbon footprint, followed by Scope 3 emissions at 38.28%.a