In 2025, Pangang Vanadium & Titanium conducted an environmental assessment and disclosed corporate waste management data in accordance with recognized sustainability reporting standards.The company provided a breakdown of its waste by type (hazardous vs non-hazardous) and treatment method (recovery vs disposal), enabling greater transparency into its waste handling and environmental practices.
| Metric (tonnes) | 2025 | 2024 | 2023 | 2022-2019 |
|---|---|---|---|---|
Total Waste Generated | 2,364,490.79a | 2,430,101.23a | 1,858,659.68a | |
Total Waste Recovered | 1,151,370.48a | N/A | N/A | |
Total Hazardous Waste Generated | 690.79a | 101.23a | 159.68a | |
Non-Hazardous Waste Disposed | 1,263,000a | N/A | N/A |
You are welcome to quote or reference individual data points from this page, provided you include the following attribution with a visible, clickable link to this page: "Source: Tracenable, the global reference for ESG data"
Bulk collection, scraping, resale, or redistribution of data across multiple company profiles is not permitted without our prior written permission. For more information, see our General Terms and Conditions.
Every figure on this dashboard has a transparent audit trail. With Tracenable, each data point is traceable back to its original source, viewable directly inside our platform.
In 2025, Pangang Vanadium & Titanium generated a total of 2,364,491metric tonnes of waste.a
Of this amount, 48.69% of Pangang Vanadium & Titanium's total waste generated was recovered through methods such as recycling, reuse, or composting, while 53.42% was disposed of through landfilling, incineration, or combustion.a
In 2025, Pangang Vanadium & Titanium reported a total waste generation of 2,364,491 metric tonnes, of which 48.69% was recovered through recycling, reuse, or composting.This moderate level of recovery indicates that Pangang Vanadium & Titanium is taking steps toward improving its waste diversion practices, though there is still room to enhance recycling and recovery efforts.a
Since 2023, Pangang Vanadium & Titanium's total waste generation increased by 27.21%, but declined by 2.7% in the year 2025, suggesting a potential shift toward more efficient material use or the early impact of waste reduction strategies.a
In 2025, Pangang Vanadium & Titanium generated a total of 2,364,491 metric tonnes of waste.a
Of this amount, 0.03% of Pangang Vanadium & Titanium's total waste generated of was classified as hazardous waste, characterized by properties such as toxicity, flammability, corrosiveness, or reactivity that may pose risks to human health, ecosystems, or the environment.99.97% was identified as non-hazardous waste, generally considered less harmful and subject to lighter regulatory controls.a
Since 2023, Pangang Vanadium & Titanium's total waste generation rose by 27.21%, but dropped by 2.7% in 2025, indicating a possible turning point driven by improved waste-reduction practices or production slowdowns.a
Over the same period, the share of hazardous waste in Pangang Vanadium & Titanium's total output increased by 240.06%, including a further 601.33% rise in 2025, suggesting a troubling upward shift toward more environmentally harmful waste streams that could raise compliance costs and environmental risks.a
Overall, while Pangang Vanadium & Titanium has recently reduced waste output, its hazardous waste share continues to rise, raising concerns about treatment efficiency or growing reliance on harmful materials despite short-term volume improvements.a
In 2025, Pangang Vanadium & Titanium reported that 691 metric tonnes of its total waste output were classified as hazardous. This represents 0.03% of its overall waste generation.a
The company treated this hazardous waste using a combination of methods.A majority (82.58%) was diverted from disposal through recovery-oriented treatments such as recycling or reuse. This suggests that Pangang Vanadium & Titanium has established processes to reduce the environmental burden of its most harmful waste streams.a